TROY STREET over STATE ROUTE 125

11-SD-125-12.10-LMGR · County 073, California · Built 2002 · 4 Lanes · 7,600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57 1039
Year Built
2002
Length
132.3 m (434.1 ft)
Max Span
50 m
Width
28.5 m (93.5 ft)
Lanes
4
Daily Traffic
7,600
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.