ROUTE 125 over CHATHAM STREET

11-SD-125-19.40-SD · County 073, California · Built 2001 · 4 Lanes · 19,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57 1046R
Year Built
2001
Length
35.1 m (115.2 ft)
Max Span
35.1 m
Width
21.6 m (70.9 ft)
Lanes
4
Daily Traffic
19,500
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.