STATE ROUTE 125 SB over FLETCHER PKWY & LRT
11-SD-125-18.42-LMSA · County 073, California · Built 2001 · 4 Lanes · 19,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.783431, -117.005567
This bridge is in worse condition than 57.1% of bridges in County 073. The average bridge in California is 0 years old; this one is 25 years old.
Nearby Bridges
WAKARUSA STREET over ROUTE 125
Built 1992
ROUTE 125 NB over FLETCHER PKWY & LRT
Built 1993
STATE ROUTE 125 over MURRAY DRIVE
Built 1993
STATE ROUTE 125 over MURRAY DRIVE
Built 1990
S125-E&W8 CONNECTR over MURRAY DRIVE
Built 1993
AMAYA DRIVE over STATE ROUTE 125
Built 2001
GROSSMONT CENTR DR over MTDB LRT & SDIV RR
Built 1961
E&W8-N125 CONNECT over N125-W8 CONN & MURRAY DR
Built 1992
W8-S125 CONNECTOR over I 8 & SR 125 & CONNS
Built 1989
S125-E8 CONNECTOR over I 8 CONN RAMPS
Built 1993
Bridge Details
- Structure #
- 57 0972L
- Year Built
- 2001
- Length
- 207 m (679.1 ft)
- Max Span
- 58.5 m
- Width
- 25.4 m (83.3 ft)
- Lanes
- 4
- Daily Traffic
- 19,500
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.