STATE ROUTE 125 over MURRAY DRIVE

11-SD-125-R15.56-LMSA · County 073, California · Built 1993 · 3 Lanes · 43,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
57 0971L
Year Built
1993
Length
41.8 m (137.1 ft)
Max Span
40.8 m
Width
21.3 m (69.9 ft)
Lanes
3
Daily Traffic
43,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.