STATE ROUTE 52 WB over SPRING CANYON

11-SD-052-12.40-SD · County 073, California · Built 1993 · 3 Lanes · 49,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57 0982L
Year Built
1993
Length
237.7 m (779.9 ft)
Max Span
91.1 m
Width
16.6 m (54.5 ft)
Lanes
3
Daily Traffic
49,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.