INTERSTATE 805 SB over MISSION CENTER RD
11-SD-805-19.19-SD · County 073, California · Built 1972 · 5 Lanes · 101,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.789167, -117.148397
This bridge is in worse condition than 57.1% of bridges in County 073. The average bridge in California is 0 years old; this one is 54 years old.
Nearby Bridges
INTERSTATE 805 NB over MISSION CENTER RD
Built 1972
MURRAY RIDGE RD over INTERSTATE 805
Built 1972
STATE ROUTE 163 over GENESEE AVE
Built 1956
FRIARS RD over QUALCOMM WAY
Built 1968
MESA COLLEGE DR over ROUTE 163 & RAMP
Built 1972
KEARNY VILLA RD over INTERSTATE 805
Built 1972
FRIARS RD over SAN DIEGO CON CO UC
Built 1968
FRIARS RD over ESCALA APARTMENT VILLAGE
Built 1968
FRIARS RD over MISSION CENTER RD
Built 1968
QUALCOMM WAY over SAN DIEGO RIVER
Built 1990
Bridge Details
- Structure #
- 57 0677L
- Year Built
- 1972
- Reconstructed
- 1987
- Length
- 71 m (232.9 ft)
- Max Span
- 29.9 m
- Width
- 24.4 m (80.1 ft)
- Lanes
- 5
- Daily Traffic
- 101,500
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.