INTERSTATE 805 SB over MAIN STREET

11-SD-805-3.65-CHV · County 073, California · Built 1971 · 4 Lanes · 92,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
57 0632L
Year Built
1971
Length
41.8 m (137.1 ft)
Max Span
41.8 m
Width
20.7 m (67.9 ft)
Lanes
4
Daily Traffic
92,500
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.