I-805 SB OFF RAMP over DECORATIVE MEDIAN

11-SD-805-5.09 · County 073, California · Built 2017 · 4 Lanes · 7,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57 1223E
Year Built
2017
Length
85 m (278.9 ft)
Max Span
38.1 m
Width
21.6 m (70.9 ft)
Lanes
4
Daily Traffic
7,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.