WARING ROAD over ALVARADO CHANNEL
11-SD-000-0.00-SD · County 073, California · Built 1959 · 2 Lanes · 10,500 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.781411, -117.087664
This bridge is in worse condition than 18.4% of bridges in County 073. The average bridge in California is 0 years old; this one is 67 years old.
Nearby Bridges
WARING ROAD over INTERSTATE 8 WB
Built 1992
WARING RD-W8 ONRMP over ALVARADO CHANNEL
Built 1959
INTERSTATE 8 EB over WARING ROAD
Built 1960
W8-WARING OFFRAMP over ALVARADO CHANNEL
Built 1959
ALVARADO CANYON RD over WARING RD/ALVARADO CRK
Built 2006
W8-FAIRMOUNT OFF over ALVARADO CANYON RD EB
Built 1979
INTERSTATE 8 over FAIRMOUNT AVE
Built 1958
NB FAIRMOUNT-W8 ON over FAIRMOUNT AVE
Built 1958
INTERSTATE 8 over FAIRMOUNT AV-W8 ON-RAMP
Built 1958
MISSION GORGE RD over ALVARADO FLOOD CNTL CHAN
Built 1952
Bridge Details
- Structure #
- 57 0478Y
- Year Built
- 1959
- Length
- 10.1 m (33.1 ft)
- Max Span
- 3.4 m
- Width
- 17.2 m (56.4 ft)
- Lanes
- 2
- Daily Traffic
- 10,500
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.