E94-N15 CONNECTOR over INTERSTATE 15

11-SD-094-3.16-SD · County 073, California · Built 1959 · 1 Lanes · 15,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
57 0351G
Year Built
1959
Length
63.4 m (208 ft)
Max Span
17.1 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
15,700
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.