STATE ROUTE 94 WB over INTERSTATE 15

11-SD-094-3.17-SD · County 073, California · Built 1959 · 5 Lanes · 74,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
57 0285L
Year Built
1959
Reconstructed
1996
Length
56.1 m (184.1 ft)
Max Span
16.8 m
Width
25.8 m (84.6 ft)
Lanes
5
Daily Traffic
74,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.