VINELAND ST over MOUNTAIN VIEW CHANNEL

0.2 MI. W/O BEAUMONT AVE. · County 065, California · Built 1986 · 2 Lanes · 1,156 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56C0349
Year Built
1986
Length
6.7 m (22 ft)
Max Span
6.1 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
1,156
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.