INTERSTATE 10 over MID FK SAN TIMOTEO CREEK

08-RIV-010-R5.71-CMSA · County 065, California · Built 1951 · 8 Lanes · 44,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56 0215
Year Built
1951
Reconstructed
2011
Length
31.2 m (102.4 ft)
Max Span
6.7 m
Width
46 m (150.9 ft)
Lanes
8
Daily Traffic
44,500
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.