STATE ROUTE 62 WB over MISSION CHANNEL OVERFLOW

08-RIV-062-R5.62 · County 065, California · Built 1966 · 2 Lanes · 9,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
56 0533L
Year Built
1966
Length
43.3 m (142.1 ft)
Max Span
12.2 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
9,000
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,244,000
Total Project Cost
$2,090,000