STATE ROUTE 62 WB over MISSION CHANNEL OVERFLOW
08-RIV-062-R5.62 · County 065, California · Built 1966 · 2 Lanes · 9,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 4 | Poor |
Location
33.993383, -116.580364
This bridge is in worse condition than 98.6% of bridges in County 065. The average bridge in California is 0 years old; this one is 60 years old.
Nearby Bridges
STATE ROUTE 62 EB over MISSION CHANNEL OVERFLOW
Built 1966
STATE ROUTE 62 WB over MISSION CHANNEL
Built 1966
STATE ROUTE 62 EB over MISSION CHANNEL
Built 1966
ACCESS ROAD over PIERSON BLVD DRAIN
Built 1966
STATE ROUTE 62 WB over DEVILS GARDEN CHANNEL
Built 1966
STATE ROUTE 62 EB over DEVILS GARDEN CHANNEL
Built 1966
STATE ROUTE 62 WB over PAINTED HILLS CHANNEL
Built 1966
PAINTED HILLS RD over OLD MORONGO RD DRAIN
Built 1966
STATE ROUTE 62 over DRY MORONGO WASH
Built 1963
PIERSON BOULEVARD over MISSION CREEK
Built 1995
Bridge Details
- Structure #
- 56 0533L
- Year Built
- 1966
- Length
- 43.3 m (142.1 ft)
- Max Span
- 12.2 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 9,000
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,244,000
- Total Project Cost
- $2,090,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.