STATE ROUTE 62 over DRY MORONGO WASH

08-SBD-062-0.01 · County 071, California · Built 1963 · 4 Lanes · 25,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 0608
Year Built
1963
Length
59.4 m (194.9 ft)
Max Span
22.6 m
Width
19.1 m (62.7 ft)
Lanes
4
Daily Traffic
25,000
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.