INTERSTATE 10 WB over SMOKY GULCH

08-RIV-010-R63.65-COA · County 065, California · Built 1964 · 2 Lanes · 11,250 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
56 0201L
Year Built
1964
Length
59.7 m (195.9 ft)
Max Span
16.8 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
11,250
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.