FILLMORE STREET over COACHELLA CANAL WSTWAY 2

50 S/O AVENUE 52 · County 065, California · Built 1993 · 2 Lanes · 1,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
56C0500
Year Built
1993
Length
39.5 m (129.6 ft)
Max Span
13.2 m
Width
12.1 m (39.7 ft)
Lanes
2
Daily Traffic
1,000
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.