EDINGER AVENUE over BOLSA CHICA CHANNEL

1.6 M. W/O BOLSA CHICA ST · County 059, California · Built 2019 · 2 Lanes · 1,529 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
55C0732
Year Built
2019
Length
102.7 m (336.9 ft)
Max Span
30.5 m
Width
14.8 m (48.6 ft)
Lanes
2
Daily Traffic
1,529
Material
Prestressed Concrete
Design
Girder and Floorbeam System
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.