BOLSA CHICA ST over WESTMINSTER CHANNEL

100 N/O EDINGER AVE · County 059, California · Built 1960 · 7 Lanes · 36,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
55C0075
Year Built
1960
Reconstructed
1972
Length
26.5 m (86.9 ft)
Max Span
8.5 m
Width
31.1 m (102 ft)
Lanes
7
Daily Traffic
36,000
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.