0.3 MI NE/O MUIRLAND BLVD · County 059, California · Built 1985 · 6 Lanes · 58,900 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.642836, -117.712728
This bridge is in worse condition than 21.9% of bridges in County 059. The average bridge in California is 0 years old; this one is 41 years old.
Nearby Bridges
JERONIMO ROAD over SERRANO CREEK CHANNEL
Built 1979
TOLEDO WAY over SERRANO CREEK CHANNEL
Built 1980
ALTON PARKWAY over SERRANO CREEK CHANNEL
Built 1979
BAKE PARKWAY over SERRANO CREEK
Built 1975
E/B ALTON PARKWAY over BNSF RY AMTRAK METROLINK
Built 1980
W/B ALTON PARKWAY over BNSF RY AMTRAK METROLINK
Built 1981
ALTON PARKWAY over SERRANO CREEK CHANNEL
Built 1979
MARINE WAY over SERRANO CREEK
Built 2024
INTERSTATE 5 over SAN DIEGO CREEK
Built 1958
INTERSTATE 5 over SERRANO CREEK
Built 1958
Bridge Details
- Structure #
- 55C0528
- Year Built
- 1985
- Length
- 41.1 m (134.8 ft)
- Max Span
- 40.4 m
- Width
- 31.7 m (104 ft)
- Lanes
- 6
- Daily Traffic
- 58,900
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.