TOLEDO WAY over SERRANO CREEK CHANNEL

100 W/O BAKE PARKWAY · County 059, California · Built 1980 · 7 Lanes · 6,100 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
55C0483
Year Built
1980
Length
11.9 m (39 ft)
Max Span
3.7 m
Width
37.6 m (123.4 ft)
Lanes
7
Daily Traffic
6,100
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.