ASSOCIATED RD over FULLERTON DAM DIV CHAN

0.3 MI N/O BASTANCHURY · County 059, California · Built 1941 · 4 Lanes · 10,400 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
55C0345
Year Built
1941
Reconstructed
1965
Length
22.3 m (73.2 ft)
Max Span
14.3 m
Width
22.6 m (74.1 ft)
Lanes
4
Daily Traffic
10,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$504,000
Total Project Cost
$846,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.