STATE ROUTE 57 over LOFTUS DIVERSION CH

12-ORA-057-19.66-FUL · County 059, California · Built 1970 · 12 Lanes · 245,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
55 0528
Year Built
1970
Reconstructed
2013
Length
31.5 m (103.3 ft)
Max Span
5.2 m
Width
73.2 m (240.2 ft)
Lanes
12
Daily Traffic
245,000
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.