S73-S5 CONNECTOR over CAMINO CAPISTRANO METRO

12-ORA-073-10.34-SJCP · County 059, California · Built 1996 · 3 Lanes · 17,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
55 0720F
Year Built
1996
Length
681.2 m (2234.9 ft)
Max Span
86.9 m
Width
18.1 m (59.4 ft)
Lanes
3
Daily Traffic
17,400
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.