N5-N73 CONNECTOR over I 5; C. C.; METRO RAIL

12-ORA-073-10.28-LGNG · County 059, California · Built 1996 · 3 Lanes · 23,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
55 0719G
Year Built
1996
Length
795.5 m (2609.9 ft)
Max Span
87.8 m
Width
18.1 m (59.4 ft)
Lanes
3
Daily Traffic
23,200
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.