SR 90 (IMPERIAL) over BREA CANYON CREEK

12-ORA-090-4.07-BRE · County 059, California · Built 1959 · 6 Lanes · 47,500 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
55 0083
Year Built
1959
Reconstructed
1993
Length
20.4 m (66.9 ft)
Max Span
4.9 m
Width
26 m (85.3 ft)
Lanes
6
Daily Traffic
47,500
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.