YUCCA LOMA over MOJAVE RIVER

RD 200 FT E OF FORTUNA LN · County 071, California · Built 2016 · 4 Lanes · 9,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54C0768
Year Built
2016
Length
489.5 m (1606 ft)
Max Span
38.9 m
Width
30 m (98.4 ft)
Lanes
4
Daily Traffic
9,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.