PIPELINE AVE over ROUTE 60

08-SBD-060-R0.86-CHN · County 071, California · Built 2022 · 3 Lanes · 10,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 1345
Year Built
2022
Length
75.6 m (248 ft)
Max Span
38.4 m
Width
25 m (82 ft)
Lanes
3
Daily Traffic
10,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.