STATE ROUTE 60 over RESERVOIR STREET

07-LA-060-R30.33-POM · County 037, California · Built 1970 · 10 Lanes · 225,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 2083
Year Built
1970
Reconstructed
1995
Length
47.5 m (155.8 ft)
Max Span
46.9 m
Width
50 m (164 ft)
Lanes
10
Daily Traffic
225,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.