WESTBOUND I-40 over HOFF WASH
08-SBD-040-R93.65 · County 071, California · Built 2017 · 2 Lanes · 8,500 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.786839, -115.423136
This bridge is in worse condition than 59.4% of bridges in County 071. The average bridge in California is 0 years old; this one is 9 years old.
Nearby Bridges
EASTBOUND I-40 over HOFF WASH
Built 2017
INTERSTATE 40 over MACDONALD WASH
Built 2007
INTERSTATE 40 over MACDONALD WASH
Built 2007
INTERSTATE 40 EB over HALLER WASH
Built 2016
INTERSTATE 40 WB over HALLER WASH
Built 2017
EASTBOUND I-40 over NEPRUD WASH
Built 2007
WESTBOUND I-40 over NEPRUD WASH
Built 2007
WESTBOUND I-40 over FORTRESS WASH
Built 2007
EASTBOUND I-40 over FORTRESS WASH
Built 2007
INTERSTATE 40 over CHUCKWALLA WASH
Built 2007
Bridge Details
- Structure #
- 54 1299L
- Year Built
- 2017
- Length
- 48.5 m (159.1 ft)
- Max Span
- 23.8 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 8,500
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.