INTERSTATE 40 over MACDONALD WASH
08-SBD-040-R94.37 · County 071, California · Built 2007 · 2 Lanes · 13,600 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.79215, -115.4123
This bridge is in worse condition than 95.8% of bridges in County 071. The average bridge in California is 0 years old; this one is 19 years old.
Nearby Bridges
INTERSTATE 40 over MACDONALD WASH
Built 2007
WESTBOUND I-40 over HOFF WASH
Built 2017
INTERSTATE 40 EB over HALLER WASH
Built 2016
INTERSTATE 40 WB over HALLER WASH
Built 2017
EASTBOUND I-40 over HOFF WASH
Built 2017
EASTBOUND I-40 over NEPRUD WASH
Built 2007
WESTBOUND I-40 over NEPRUD WASH
Built 2007
INTERSTATE 40 over CHUCKWALLA WASH
Built 2007
INTERSTATE 40 over CHUCKWALLA WASH
Built 2007
INTERSTATE 40 over MUSTANG WASH
Built 2007
Bridge Details
- Structure #
- 54 1277R
- Year Built
- 2007
- Length
- 30.5 m (100.1 ft)
- Max Span
- 29.6 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 13,600
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.