WESTBOUND I-40 over MARBLE WASH

08-SBD-040-R80.42 · County 071, California · Built 2007 · 2 Lanes · 8,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 1274L
Year Built
2007
Length
32.3 m (106 ft)
Max Span
31.4 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
8,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.