INTERSTATE 40 WB over WILLOW SPRINGS WASH

08-SBD-040-R77.39 · County 071, California · Built 1972 · 2 Lanes · 8,500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
54 0853L
Year Built
1972
Length
53.6 m (175.9 ft)
Max Span
15.2 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
8,500
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$686,000
Total Project Cost
$1,152,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.