E210 S215 CONNECTR over S215 OFF TO 27TH STREET

08-SBD-210-R21.81-SBD · County 071, California · Built 2012 · 2 Lanes · 1,001 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 1249G
Year Built
2012
Length
53.4 m (175.2 ft)
Max Span
53.4 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
1,001
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.