STATE ROUTE 210 EB over INTERSTATE 215 & RAMPS

08-SBD-210-R21.84-SBD · County 071, California · Built 1989 · 5 Lanes · 59,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
54 0947R
Year Built
1989
Reconstructed
2007
Length
94.5 m (310 ft)
Max Span
39.9 m
Width
30.1 m (98.8 ft)
Lanes
5
Daily Traffic
59,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.