SUMMIT AVENUE over INTERSTATE 15

08-SBD-015-9.60-RCUC · County 071, California · Built 1999 · 4 Lanes · 5,001 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
54 0978
Year Built
1999
Length
119.8 m (393 ft)
Max Span
64 m
Width
26.1 m (85.6 ft)
Lanes
4
Daily Traffic
5,001
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.