SUMMIT AVENUE over INTERSTATE 15
08-SBD-015-9.60-RCUC · County 071, California · Built 1999 · 4 Lanes · 5,001 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
34.150253, -117.4798
This bridge is in worse condition than 59.4% of bridges in County 071. The average bridge in California is 0 years old; this one is 27 years old.
Nearby Bridges
WILSON AVENUE over SAN SEVAINE FL. C. BASIN
Built 1985
CHERRY AVENUE over HAWKER-CRAWFORD CHANNEL
Built 1976
INTERSTATE 15 SB over CHERRY AVENUE
Built 1976
WILSON AVENUE over SAN SEVAINE FL. C. BASIN
Built 1985
INTERSTATE 15 NB over CHERRY AVENUE
Built 1976
STATE ROUTE 210 over SAN SEVAINE ROAD
Built 2000
W210-N15 CONNECTOR over CHERRY AVENUE
Built 2000
W210-S15 CONNECTOR over CHERRY AVENUE
Built 2000
STATE ROUTE 210 WB over BEECH AVENUE
Built 2000
W210-S15 CONN RAMP over E210-N15 CONNECTOR RAMP
Built 2001
Bridge Details
- Structure #
- 54 0978
- Year Built
- 1999
- Length
- 119.8 m (393 ft)
- Max Span
- 64 m
- Width
- 26.1 m (85.6 ft)
- Lanes
- 4
- Daily Traffic
- 5,001
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.