INTERSTATE 15 NB over CHERRY AVENUE

08-SBD-015-8.83-RCUC · County 071, California · Built 1976 · 7 Lanes · 80,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 0970R
Year Built
1976
Reconstructed
2001
Length
72.8 m (238.8 ft)
Max Span
36.4 m
Width
31.7 m (104 ft)
Lanes
7
Daily Traffic
80,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.