INTERSTATE 15 SB over HALLORAN WASH

08-SBD-015-147.65 · County 071, California · Built 1961 · 3 Lanes · 18,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 0287L
Year Built
1961
Reconstructed
2004
Length
33.1 m (108.6 ft)
Max Span
7.4 m
Width
21.3 m (69.9 ft)
Lanes
3
Daily Traffic
18,500
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.