HALLORAN SUMMIT RD over INTERSTATE 15
08-SBD-015-155.57 · County 071, California · Built 1961 · 2 Lanes · 130 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.402875, -115.791439
This bridge is in worse condition than 17% of bridges in County 071. The average bridge in California is 0 years old; this one is 65 years old.
Nearby Bridges
INTERSTATE 15 NB over KALI DITCH
Built 1961
INTERSTATE 15 SB over KALI DITCH
Built 2004
INTERSTATE 15 NB over HOT WASH
Built 2003
INTERSTATE 15 SB over HOT WASH
Built 2003
INTERSTATE 15 SB over DALE DITCH
Built 1961
INTERSTATE 15 NB over DALE DITCH
Built 1961
INTERSTATE 15 NB over WEST VALLEY WELLS DITCH
Built 2003
INTERSTATE 15 SB over WEST VALLEY WELLS DITCH
Built 2003
INTERSTATE 15 NB over VALLEY WELLS DITCH
Built 2003
INTERSTATE 15 SB over VALLEY WELLS DITCH
Built 2003
Bridge Details
- Structure #
- 54 0347
- Year Built
- 1961
- Length
- 78.2 m (256.6 ft)
- Max Span
- 26.5 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 130
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.