HOLLOW SPRINGS DR over LIMEKILN CANYON

40 FT W/O TAMPA AVE · County 037, California · Built 1989 · 2 Lanes · 710 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
53C1974
Year Built
1989
Length
88.7 m (291 ft)
Max Span
22 m
Width
18.2 m (59.7 ft)
Lanes
2
Daily Traffic
710
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.