TAMPA AVE-W118 ON over LIMEKILN CANYON WASH

07-LA-118-R4.54-LA · County 037, California · Built 1980 · 2 Lanes · 5,129 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 2502K
Year Built
1980
Length
88.4 m (290 ft)
Max Span
36 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
5,129
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.