NEWHALL RANCH RD over BOUQUET CYN CHAN

0.2MI W/O BOUQUET CYN RD · County 037, California · Built 1985 · 8 Lanes · 48,974 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53C1836
Year Built
1985
Reconstructed
1992
Length
51.6 m (169.3 ft)
Max Span
23.5 m
Width
49.2 m (161.4 ft)
Lanes
8
Daily Traffic
48,974
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.