BOUQUET CYN RD NX over BOUQUET CYN CRK

1.4MI N/O SOLEDAD CYN RD · County 037, California · Built 1976 · 4 Lanes · 43,732 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53C0478
Year Built
1976
Length
55.5 m (182.1 ft)
Max Span
21.3 m
Width
32.9 m (107.9 ft)
Lanes
4
Daily Traffic
43,732
Material
Concrete Continuous
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.