ARTESIA BLVD over UPRR / METROLINK
0.3MI W/O ALAMEDA ST · County 037, California · Built 1974 · 4 Lanes · 25,440 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 4 | Poor |
Location
33.874536, -118.221964
This bridge is in worse condition than 97.4% of bridges in County 037. The average bridge in California is 0 years old; this one is 52 years old.
Nearby Bridges
STATE ROUTE 91 over UP RR MTA BLUE LINE
Built 1974
AUTO DR S over COMPTON CRK
Built 1980
STATE ROUTE 91 over ACACIA AVE
Built 1974
TOWN CENTER DR over COMPTON CRK
Built 1980
SANTA FE AV-ART BL over COMPTON CRK E
Built 1952
ARTESIA BLVD over UPRR COMPTON CR ALAMEDA
Built 1956
ALAMEDA ST-E91 ON over ALAMEDA ST COMPTON CRK
Built 1974
ALAMEDA ST over COMPTON CRK
Built 1937
E91-SANTA FE OFFRP over COMPTON CREEK RR TRACKS
Built 1974
STATE ROUTE 91 over ALAMEDA SANTA FE UP RR
Built 1974
Bridge Details
- Structure #
- 53C1743
- Year Built
- 1974
- Length
- 51.8 m (169.9 ft)
- Max Span
- 22.9 m
- Width
- 24.3 m (79.7 ft)
- Lanes
- 4
- Daily Traffic
- 25,440
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,260,000
- Total Project Cost
- $2,118,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.