ALAMEDA ST over COMPTON CRK
0.1MI S/O ARTESIA BLVD · County 037, California · Built 1937 · 4 Lanes · 10,710 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
33.872486, -118.216692
This bridge is in worse condition than 97.4% of bridges in County 037. The average bridge in California is 0 years old; this one is 89 years old.
Nearby Bridges
ALAMEDA ST-E91 ON over ALAMEDA ST COMPTON CRK
Built 1974
ARTESIA BLVD over UPRR COMPTON CR ALAMEDA
Built 1956
E91-SANTA FE OFFRP over COMPTON CREEK RR TRACKS
Built 1974
STATE ROUTE 91 over ALAMEDA SANTA FE UP RR
Built 1974
SANTA FE AV-ART BL over COMPTON CRK E
Built 1952
W91-ARTESIA+SAN FE over ARTESIA BL SANTA FE AV
Built 1974
SANTA FE AVE over COMPTON CRK E
Built 1953
STATE ROUTE 91 over UP RR MTA BLUE LINE
Built 1974
AUTO DR S over COMPTON CRK
Built 1980
ARTESIA BLVD over UPRR / METROLINK
Built 1974
Bridge Details
- Structure #
- 53C0599
- Year Built
- 1937
- Length
- 115.5 m (378.9 ft)
- Max Span
- 30.5 m
- Width
- 16.6 m (54.5 ft)
- Lanes
- 4
- Daily Traffic
- 10,710
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,917,000
- Total Project Cost
- $7,680,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.