183RD ST over SAN GABRIEL RIV

0.3MI W/O STUDEBAKER RD · County 037, California · Built 1972 · 4 Lanes · 16,251 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53C1541
Year Built
1972
Length
41.8 m (137.1 ft)
Max Span
41.5 m
Width
24.7 m (81 ft)
Lanes
4
Daily Traffic
16,251
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.