SOUTH STREET over INTERSTATE 605

07-LA-605-R3.75-CRTS · County 037, California · Built 1966 · 6 Lanes · 16,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
53 1732
Year Built
1966
Length
80.5 m (264.1 ft)
Max Span
28.8 m
Width
28.7 m (94.2 ft)
Lanes
6
Daily Traffic
16,700
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.