HARVEST AVE over GRIDLEY DRN
0.2MI E/O STUDEBAKER RD · County 037, California · Built 1964 · 2 Lanes · 28,629 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
33.843175, -118.091722
This bridge is in worse condition than 64.9% of bridges in County 037. The average bridge in California is 0 years old; this one is 62 years old.
Nearby Bridges
DEL AMO BLVD over INTERSTATE 605
Built 1966
STUDEBAKER RD over GRIDLEY DRN
Built 1962
CENTRALIA ROAD over INTERSTATE 605
Built 1964
DEL AMO BLVD over SAN GABRIEL RIV
Built 1966
195TH STREET over INTERSTATE 605
Built 1964
CARSON ST over SAN GABRIEL RIV
Built 1971
CARSON ST over SAN GABRIEL RIV
Built 1971
INTERSTATE 605 over CARSON STREET
Built 1966
CENTRALIA ST over PALO VERDE DRN
Built 1977
CARSON ST-N605 over N605-CARSON ST OFF-RAMP
Built 2001
Bridge Details
- Structure #
- 53C1484
- Year Built
- 1964
- Length
- 14.8 m (48.6 ft)
- Max Span
- 7.4 m
- Width
- 14.3 m (46.9 ft)
- Lanes
- 2
- Daily Traffic
- 28,629
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.