CARSON ST over SAN GABRIEL RIV

0.5MI W/O I-605 FWY · County 037, California · Built 1971 · 2 Lanes · 34,632 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
53C0422R
Year Built
1971
Length
68.3 m (224.1 ft)
Max Span
21.9 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
34,632
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.