TEMPLE CITY BLVD over EATON WASH

1.0MI E/O ROSEMEAD BLVD · County 037, California · Built 1956 · 4 Lanes · 13,481 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
53C1419
Year Built
1956
Length
17.7 m (58.1 ft)
Max Span
16.8 m
Width
19.3 m (63.3 ft)
Lanes
4
Daily Traffic
13,481
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$341,000
Total Project Cost
$1,591,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.